omplete one stop plastic solution:
1. mould design
2. mould making
3. moulding from the mould
4. secondary operation
5. assembly Â
Â
 Our strength:
1. 20 years experience and expertise
2. professional proposal and suggestion
3. experienced core team, from project manager, mold designer to mold builder and steel checking clerk
4.  suitable solution and reasonable price
5. 100% on time delivery
  Our mould product project management
Â
standard mouldÂ
Â
Mould steel |
NAK80,718H,P20,1.1730,2344,SKD61,2316,S136,3Cr13 etc. |
Plastic material |
PP,PS,PE,PET,TPR,PVC,PA,POM,ABS,PC,PPR etc. |
Mould base |
LKM,HASCO etc. |
Hot runner system |
HASCO,YUDO,D-M-E etc. |
Standard mould parts |
DME,HASCO,JIS,CUMSA etc |
Design software |
UG,PRO-E,AUTOCAD,MOULDFLOW,SOLIDWORKS etc |
Min mould life |
different steel different production, min mold life 200,000 shots |
Doff way |
Auto by ejectors, Doff plates, Air valves etc. |
Leading time |
1week-2 months |
process |
CNC, High speed carve, E.D.M, Wire cut, Drill, Injection etc. |
Packing |
Free fumigation case |
 ISO9001:2008 and TS16949 quality management system certified
Our workshop
Â
Â
Bored Secant Pile Drilling Rig
Bored secant pile is mostly constructed by bushing pile rig in our country.
The method has the excellence credible technology, agility economy and advantage construction, which is very suitable to the permanent foundation pit retaining in Bridge of Underpasses
As retaining wall structure
Xuzhou Jingan Heavy Industry Manufacture Co.,Ltd. , https://www.jinganmachine.com